Hospitals are replacing steam heating with heat pumps and heat recovery because those systems capture waste heat from cooling and reuse it for heating and hot water. New York’s Empire Building Challenge awarded nearly $28 million to eight hospitals for these conversions. The phased approach, starting with heat recovery and lower-temperature hot water, is a template for other large buildings with central plants.
Key Takeaways
New York awarded nearly $28 million to eight hospitals to replace steam systems with heat pumps, heat recovery chillers, thermal storage and low-temperature hot water.
The projects are expected to cut more than 213,000 MMBtu a year.
Inpatient health care buildings used 193.3 thousand Btu per square foot in EIA’s latest survey, more than double the 70,600 Btu average for commercial buildings.
Heat recovery captures energy hospitals already produce and moves it to where heat is needed.
The same central plant approach applies to offices, hotels and campuses with steam systems.
The Hardest Buildings Go First
213,000 MMBtu. That is how much energy eight New York hospitals expect to save each year from projects funded with nearly $28 million in state awards announced November 9. The money comes from the Empire Building Challenge: Hospitals Program, run by the New York State Energy Research and Development Authority (NYSERDA).
Hospitals are among the most demanding buildings to convert. Inpatient health care buildings used 193.3 thousand Btu per square foot in the U.S. Energy Information Administration’s (EIA) most recent commercial buildings survey, compared with an average of 70,600 Btu across all commercial buildings. Health care buildings account for about 9% of commercial building energy use. They run around the clock, require heavy ventilation and cannot tolerate interruptions in heating, cooling or hot water.
That is why the program treats them as demonstrations. NYSERDA President Doreen M. Harris said the projects create “blueprints for the transformation of existing spaces into energy efficient, low-carbon healthcare facilities.”
What the Hospitals Are Building
The six projects at eight hospitals follow a common pattern.
Geneva General Hospital (Finger Lakes Health), more than $3.5 million: a high-efficiency cooling plant, central building management system, efficient air handlers and a heat recovery chiller, saving about 40,500 MMBtu a year.
Katz Women’s Hospital at Long Island Jewish Medical Center in Queens, nearly $4.3 million: a heat recovery chiller, exhaust air heat recovery and conversion from steam to low-temperature hot water, about 31,000 MMBtu.
Montefiore’s Wakefield, Weiler and Westchester Square hospitals in the Bronx, nearly $4.9 million: heat recovery heat pumps for heating, about 25,000 MMBtu.
Phelps Memorial Hospital in Sleepy Hollow (Northwell Health), more than $5 million: a heat recovery chiller, heat pumps, thermal storage and steam-to-hot-water conversion, about 30,000 MMBtu.
Elmhurst Hospital Center in Queens (NYC Health + Hospitals), more than $5 million: heat pump chillers with heat recovery and controls upgrades, more than 33,700 MMBtu.
St. Barnabas Hospital in the Bronx (SBH Health System), more than $5 million: replacing a steam chiller plant with an electric chiller plant, about 53,300 MMBtu.
Why Heat Recovery Comes First
Large buildings often heat and cool at the same time. Interior zones, equipment rooms and process loads need cooling year-round, while perimeter zones and hot water need heat. A conventional plant rejects heat from chillers outdoors while burning fuel in boilers. A heat recovery chiller captures that rejected heat and sends it to hot water and space heating.
Lower water temperatures make that possible. Steam systems run hot; heat pumps work best when hot water loops run at lower temperatures. That is why several projects pair heat recovery with conversion from steam to low-temperature hot water. Thermal storage, as at Phelps, lets a building make heat or cooling when it is cheapest and use it later, which also helps manage demand charges.
A Program Built to Be Copied
The Empire Building Challenge started with large multifamily and commercial buildings before adding hospitals. Its third general round in 2025 awarded about $28 million to 10 projects whose partners represent more than 123 million square feet of real estate, with awards of up to $3 million per project. The hospital program offers up to $5 million per hospital, prioritizes facilities in disadvantaged communities and includes up to $50,000 for operations and maintenance training on new equipment.
Gov. Kathy Hochul said the awards help hospitals “operate more efficiently, manage rising costs” while improving facilities.
How Hospitals Use Energy
Inpatient buildings dominate health care energy use. They account for 68% of the sector’s electricity use and 82% of its natural gas use, according to EIA. Gas use is concentrated in steam and hot water for heating, sterilization and humidification, which is why steam conversion is central to the New York projects.
Hospitals have shown they can improve. Inpatient health care energy intensity fell 16% between 2012 and 2018, the largest drop of any commercial building type in EIA’s survey, while commercial buildings overall fell 12%. The New York awards push that trend from efficiency into fuel switching.
Paying for the Conversion
State grants cover only part of the cost. The 2025 round of the Empire Building Challenge said its awards would help unlock more than $150 million in private investment. Owners outside New York can look to Commercial Property Assessed Clean Energy (C-PACE) programs, which typically finance heat recovery, chillers, boilers, controls and envelope improvements over the useful life of the equipment. Texas’s program guide, for example, lists heat recovery, high-efficiency chillers and boilers and automated controls as eligible measures. Fixed-rate, long-term financing matches the long life of central plant equipment.
What It Means for Other Large Buildings
Implication: Central plants are the target. Offices, hotels, universities and life science buildings with steam or high-temperature hot water face the same conversion path.
Opportunity: Start with heat recovery. Capturing heat already produced by cooling equipment lowers fuel use without replacing the whole plant at once.
Opportunity: Phase the work. Lowering hot water temperatures and upgrading controls can come before full electrification, spreading capital costs across budget cycles.
Risk: Electrical capacity. Electric chillers and heat pumps add load. Confirm service capacity and utility upgrade timelines early.
Risk: Operations training. New systems need different skills, which is why the program funds training.
Frequently Asked Questions
How much did New York award to hospitals?
Nearly $28 million to eight hospitals through NYSERDA’s Empire Building Challenge: Hospitals Program, announced November 9, 2026.
Why are hospitals hard to electrify?
They run around the clock with heavy ventilation and use far more energy per square foot than typical commercial buildings.
What is a heat recovery chiller?
A chiller that captures heat removed during cooling and reuses it for space heating and hot water.
Does this apply to offices and hotels?
Yes. Any building with a central steam or hot water plant can use the same phased approach.
Sources
New York State Energy Research and Development Authority. “Nearly $28 Million Awarded to New York Hospitals to Advance Energy Efficiency and Electrification.” Nov. 9, 2026. https://www.nyserda.ny.gov/About/Newsroom/2026-Announcements/2026-11-09-Governor-Hochul-Announces-Nearly-28-Mill-Awarded-To-NY-Hospitals
Office of Gov. Kathy Hochul. “Governor Hochul Announces Nearly $28 Million Awarded to Advance Energy Efficiency and Electrification.” Sept. 5, 2025. https://www.governor.ny.gov/news/governor-hochul-announces-nearly-28-million-awarded-advance-energy-efficiency-and
Office of Gov. Kathy Hochul. “Governor Hochul Announces Nearly $28 Million Awarded to New York Hospitals to Advance Energy Efficiency and Electrification.” Nov. 9, 2026. https://www.governor.ny.gov/news/governor-hochul-announces-nearly-28-million-awarded-new-york-hospitals-advance-energy
Smart Energy Decisions. “NY State Funds Electrification Upgrades at Hospitals.” 2025. https://www.smartenergydecisions.com/news/ny-state-funds-electrification-upgrades-at-hospitals
Texas PACE Authority. “TX-PACE Program Guide, Version 4.3.” June 2026. https://www.texaspaceauthority.org/wp-content/uploads/2026/06/TPA-Program-Guide_4-3_sm.pdf
U.S. Energy Information Administration. “Commercial Buildings Energy Consumption Survey: Health Care.” 2018 survey data. https://www.eia.gov/consumption/commercial/pba/health-care.php
U.S. Energy Information Administration. “U.S. Commercial Buildings Continued to Increase Their Energy Efficiency as of 2018.” Sept. 29, 2022. https://www.eia.gov/todayinenergy/detail.php?id=54059

